RiverRestoration

P.O. Box 248
Carbondale, CO  81623
(970) 947-9568
Email Us

RiverRestoration is dedicated to resolving river issues. RiverRestoration provides the creative planning, engineering and technical support required in any successful river project. Our philosophy is to take a whole system approach to river projects to meet the multiple needs of ecology, recreation and water users for an overall higher functioning system. We identify degradations, uncover use issues and site constaints, and find solutions that benefit the whole system.

Black Gore Creek Total Maximum Daily Load (2004-2006)

Untitled Image
This photograph shows an example of the system wide aggradation caused from excessive non-point source sediments originating from the maintenance and operation of Interstate 70
Black Gore Creek
Eagle River Watershed, Colorado

RiverRestoration.org is leading a multi agency, multi disciplinary team in developing the Black Gore Creek Total Maximum Daily Load to address the impacts of I-70 on Black Gore Creek at Vail Pass. Construction, operation and maintenance of I-70 have caused adverse sedimentation in Black Gore Creek, impairing aquatic life. RiverRestoration.org has worked outside the box to create new ideas and incorporate projects that will create a functioning TMDL and guide restoration projects. RiverRestoration.org has developed a Load Capacity calculation and designed an analysis plan for the annual Source Allocation and associated Sediment Budget. RiverRestoration.org has prepared and executed a Sediment Source Monitoring Plan to support implementation of the TMDL.

Highlights
  • Intergovernment and Agency coordination
  • Developed and Implemented a Monitoring Plan
  • Non-point source pollution control and restoration
  • Sediment Transport Analysis